Stryker Ireland
Status
Complete
Sector
Healthcare
Client
Stryker Ireland
Completion date
2019

Project description
Project Scope
The works comprised of the construction a new 90,000sqft additive manufacturing facility situated within an established technology park. The development included manufacturing floor space, ISO 7 cleanrooms, chiller rooms, plant room, finished goods area, offices, canteen, conference rooms and ancillary facilities. The building was constructed with a steel frame, precast concrete floors, in-situ concrete beams, columns, stairs and lift cores. The façade included an external SFS framing system with composite cladding panels, curtain walling and glazing.
The project also included a heavily protected stand-alone Titanium Store building; all necessary site
clearance/prep works and bulk dig/excavation, bored pile foundations, attenuation pond, paladin fencing/railings, all hard and soft landscaping, all underground site services and any making good required to the existing grounds impacted by the completion of these project works.
Sustainability
The project included the following energy saving measures in the design:- High efficiency lighting; Heat Recovery; Building Energy Management Systems; Metering and Sub-metering of Distribution Boards and Water Supplies; High Thermal U-Values on building insulation and glazing; Sensor Operated Sanitary Fittings; Variable Speed Controls for Motors and Pumps; Low water content heating emitters; Grey Water Harvesting. A “Live” Campus Location Working within a “live” business park campus location, surrounded on all boundaries by adjacent occupied
businesses with limited access for construction traffic. The main access for the site was located on the main street which required a banksman and a traffic management system for all deliveries of materials and construction waste collection.
Health and Safety
Implementation of the General Principles of Prevention informed all design decisions. Relevant staff attended regular Health & Safety focused CPD courses and are informed on the provisions of the Safety, Health and Welfare at Work Act 2005, the Safety, Health and Welfare at Work (Construction) Regulations 2013 and the Safety, Health and Welfare at Work (General Application) Regulations 2007.
Key Details
- Architect: Henry J Lyons
Features & amenities
24x7 Security
Sed ut perspiciatis unde omnis iste natus error sit voluptatem.
Surveillance System
Nemo enim ipsam voluptatem quia voluptas sit aspernatur.
Fitness Center
Consectetur quae ab illoentore veritatis
Children's play area
Totam rem aperiam, eaque ipsa quae ab illo inventore.
24 hour maintenance
Consectetur quae ab illoentore veritatis
Swimming Pool
Totam rem aperiam, eaque ipsa quae ab illo inventore.
Firefighting System
Sed ut perspiciatis unde omnis iste natus error sit voluptatem.
Landscape Garden
Nemo enim ipsam voluptatem quia voluptas sit aspernatur.
Location
address
2972 Westheimer Rd. Santa Ana, Illinois 85486
Key transport
Coast
300m
University
750m
Supermarket
500m
Park
1120m
Railway station
1750m
Airport
3158m
Bus station
450m
Bank
415m
Hospital
350m