Part L remains the legal energy-performance baseline for new buildings in Ireland, but the BER framework has already moved to a new scale and the EU zero-emission building deadlines are now close enough to affect projects at concept stage. For teams designing long-programme commercial and mixed-use developments, the important issue is not just what applies today – it is which plant, electrical and fabric decisions will still be locked in when the 2028 and 2030 requirements arrive.
Part L Is a Statutory Baseline
Part L of the Building Regulations deals with the conservation of fuel and energy. For buildings other than dwellings, the current Technical Guidance Document is the 2022 edition. It sets the route used to demonstrate compliance with the Building Regulations across the building fabric and fixed services, including the energy performance of heating, cooling, ventilation, lighting, controls and renewable-energy provision.
That is fundamentally different from LEED or BREEAM. Part L is a statutory requirement. A Building Energy Rating (BER) is the energy-performance certificate produced from the relevant assessment methodology, while voluntary certification schemes assess a broader set of environmental or building-quality issues. The calculations overlap, but the legal and certification purposes are different.
For project teams, this matters because Part L and BER work should not sit at the end of the design programme. The results are shaped by concept-stage decisions on envelope performance, heat source, ventilation, controls, lighting, renewable generation and electrical infrastructure. If those decisions are made without modelling their effect, the compliance exercise becomes a late correction rather than a design tool.
What Changed in May 2026
Ireland’s BER framework changed on 24th May 2026 as part of the transposition of the recast Energy Performance of Buildings Directive (EPBD). S.I. No. 168/2026 applies to dwellings, while S.I. No. 195/2026 covers buildings other than dwellings. The change introduces a simplified BER scale and a new A0 category associated with zero-emission buildings, together with additional reporting metrics on energy use, global warming potential (GWP) and greenhouse-gas emissions.
For the non-domestic audience, S.I. No. 195/2026 is the key instrument. The previous alpha-numeric subdivisions are replaced by a simpler scale, and A0 ranks above the remaining letter bands. The important point is that this does not mean every new building in Ireland must already achieve A0. The BER framework has been updated ahead of the dates when the EU zero-emission standard becomes mandatory for new buildings.
| Date | Change | What it means for project teams |
|---|---|---|
| 24th May 2026 | New BER framework takes effect, including A0 and simplified bands. S.I. No. 168/2026 applies to dwellings; S.I. No. 195/2026 applies to buildings other than dwellings. | BER certificates and performance reporting now reflect the new framework; design teams should understand how current projects sit relative to the future zero-emission standard. |
| 1st January 2028 | New buildings owned by public bodies must meet the zero-emission building standard. | Public-sector programmes with long lead times need the target embedded in the brief, energy strategy and procurement now. |
| 1st January 2028 | Life-cycle GWP (Global Warming Potential) must be calculated and disclosed for new buildings over 1,000 m². | Whole-life carbon data and design responsibilities need to be planned early, not assembled retrospectively. |
| 1st January 2030 | All other new buildings must meet the zero-emission building standard. | Private-sector developments entering design now may be affected depending on programme, permitting and national implementation. |
| 1st January 2030 | Life-cycle GWP disclosure extends to all new buildings. | Carbon reporting becomes a normal project deliverable rather than a specialist add-on. |
These are EU-level deadlines and current Irish implementing measures as checked on 22nd September 2026. Project-specific compliance should always be assessed against the legislation and guidance applicable to that project, including any transitional provisions.
What a Zero-Emission Building Changes in Practical Design Terms
Under the recast EPBD, a zero-emission building has a very high energy performance, no on-site carbon emissions from fossil fuels and zero or very low operational greenhouse-gas emissions. In practical design terms, that direction reinforces several changes that Irish project teams are already dealing with:
- Lower building loads.
- Electrified heat.
- Better controls.
- More renewable generation.
- Better metering.
- Closer coordination between the envelope and MEP systems.
For a developer, the biggest risk is not necessarily the regulation arriving unexpectedly, but making a concept-stage decision today that removes a viable route to compliance later. A gas-based plant strategy, undersized electrical intake, insufficient roof allowance for PV, limited plant space or a ventilation approach with poor specific fan power can all become expensive constraints once the structure, planning layout and electrical infrastructure are fixed.
Five Decisions That Need to Move Earlier in the Programme
1. Fabric and load reduction. Before plant is sized, the project team needs an agreed view of envelope performance, glazing, solar gain, airtightness and internal loads. Better load reduction can reduce heat-pump capacity, electrical demand and plant space – but only if the analysis happens before systems are selected.
2. Heat source and operating temperatures. Heat pumps are most effective when the building and distribution systems are designed around appropriate flow temperatures and load profiles. Retrofitting a heat-pump strategy onto emitters, air systems or hot-water demands designed for a different heat source can quickly create capacity and efficiency problems.
3. Electrical capacity. Electrification shifts demand from fuel to electricity. Maximum demand, transformer and substation capacity, standby power, distribution-board sizing and future EV or PV connections all need to be assessed as one strategy rather than as separate packages.
4. Controls, metering and commissioning. Part L compliance is not just about selecting efficient equipment. Control zones, setpoints, time schedules, Building Energy Management System (BEMS) points, metering hierarchy and commissioning all determine whether the designed performance can be demonstrated and maintained in operation.
5. Carbon and information requirements. The move towards life-cycle GWP (Global Warming Potential) reporting means design information will increasingly have to support both operational-energy and embodied-carbon calculations. That puts more emphasis on structured data, responsibility matrices and information management across the design and construction team.
How WOODS Engineering Approaches Part L, BER and Future Readiness
WOODS Engineering provides in-house IES energy modelling, Part L assessment and BER work alongside the MEP design. That matters because the model can be used as part of design development rather than treated as a separate compliance check. The mechanical, electrical and public health design can be tested against the same assumptions that drive the regulatory result, allowing the team to see the effect of changes before they are fixed into tender information.
WOODS Engineering project example: At 1BQ in Limerick, the residential block achieved Nearly Zero Energy Building (NZEB) and Part L compliance through a high-performance envelope and air-to-air heat-pump strategy. The value of that example is not the technology in isolation; it is the sequence. Envelope and services decisions were coordinated early enough for the energy strategy to be designed into the building rather than added after the layout was fixed.
For projects whose design, procurement or completion programme runs into the 2028–2030 period, the sensible approach is to model against the likely future direction now. That does not mean pretending a future requirement already applies. It means protecting the options that will be costly to recover later: electrical capacity, roof and plant space, low-temperature heat distribution, controls, metering and data.
If you are setting the energy strategy for a project now, WOODS Engineering can bring the Part L, BER, IES modelling and MEP design together at concept stage – when the team still has time to make the right decisions.
Sources
- gov.ie – Technical Guidance Document L, Buildings other than Dwellings (2022)
- Irish Statute Book – S.I. No. 168/2026 (dwellings)
- Irish Statute Book – S.I. No. 195/2026 (buildings other than dwellings)
- European Commission – Nearly-zero energy and zero-emission buildings
- European Commission – Global warming potential of buildings
- WOODS Engineering – 1BQ Offices & Residences