Project description

Project Scope

The works comprised of the construction a new 90,000sqft additive manufacturing facility situated within an established technology park. The development included manufacturing floor space, ISO 7 cleanrooms, chiller rooms, plant room, finished goods area, offices, canteen, conference rooms and ancillary facilities. The building was constructed with a steel frame, precast concrete floors, in-situ concrete beams, columns, stairs and lift cores. The façade included an external SFS framing system with composite cladding panels, curtain walling and glazing.

The project also included a heavily protected stand-alone Titanium Store building; all necessary site
clearance/prep works and bulk dig/excavation, bored pile foundations, attenuation pond, paladin fencing/railings, all hard and soft landscaping, all underground site services and any making good required to the existing grounds impacted by the completion of these project works.

Sustainability
The project included the following energy saving measures in the design:- High efficiency lighting; Heat Recovery; Building Energy Management Systems; Metering and Sub-metering of Distribution Boards and Water Supplies; High Thermal U-Values on building insulation and glazing; Sensor Operated Sanitary Fittings; Variable Speed Controls for Motors and Pumps; Low water content heating emitters; Grey Water Harvesting. A “Live” Campus Location Working within a “live” business park campus location, surrounded on all boundaries by adjacent occupied
businesses with limited access for construction traffic. The main access for the site was located on the main street which required a banksman and a traffic management system for all deliveries of materials and construction waste collection.

Health and Safety
Implementation of the General Principles of Prevention informed all design decisions. Relevant staff attended regular Health & Safety focused CPD courses and are informed on the provisions of the Safety, Health and Welfare at Work Act 2005, the Safety, Health and Welfare at Work (Construction) Regulations 2013 and the Safety, Health and Welfare at Work (General Application) Regulations 2007.

Key Details

Features & amenities

24x7 Security

Sed ut perspiciatis unde omnis iste natus error sit voluptatem.

Surveillance System

Nemo enim ipsam voluptatem quia voluptas sit aspernatur.

Fitness Center

Consectetur quae ab illoentore veritatis

Children's play area

Totam rem aperiam, eaque ipsa quae ab illo inventore.

24 hour maintenance

Consectetur quae ab illoentore veritatis

Swimming Pool

Totam rem aperiam, eaque ipsa quae ab illo inventore.

Firefighting System

Sed ut perspiciatis unde omnis iste natus error sit voluptatem.

Landscape Garden

Nemo enim ipsam voluptatem quia voluptas sit aspernatur.

Location

address
2972 Westheimer Rd. Santa Ana, Illinois 85486
Key transport

Coast
300m

University
750m

Supermarket
500m

Park
1120m

Railway station
1750m

Airport
3158m

Bus station
450m

Bank
415m

Hospital
350m

Request more information